Project for the Expansion of the Sewer Network and Construction of the Wastewater Treatment Plant in Esporões

Municipality of Trancoso

Introduction

This technical project consisted of the design and implementation of an integrated solution for the water and wastewater drainage network in the town of Esporões. The intervention included the replacement of existing supply infrastructure and the installation of a Compact Wastewater Treatment System (WWTP), designed to ensure environmental efficiency and the protection of public health.

Context and Need

The project’s necessity was based on the extension of the wastewater network, anticipating that the existing water infrastructure would be affected by ruptures during trenching. To serve a population of 117 equivalent inhabitants, priority was given to implementing a system that met the discharge limits established by Decree-Law No. 152/97. The intervention aimed to replace obsolete systems with stable technology capable of withstanding peak organic loads without compromising treatment efficiency.

Summary of the Project Completed

The project materialized through a technical solution divided into three main axes:

The assembly of the units was carried out with the support of rotating cranes on leveled sand beds, ensuring the solidity and durability of the station, which requires only simple automatic maintenance operations.


Would you like to learn more about hydraulic infrastructure solutions or contact our team for a specific project? Visit our complete portfolio or contact us through our website.

Discover how we can make your project a reality.

Get in touch with us and let’s create something extraordinary together.

cta_promo_1