Sanitary Sewerage Project in Cunqueiros and Vergão

Municipality of Proença-a-Nova

Introduction

This technical project consisted of the design and development of the implementation system for the domestic wastewater sanitation network and its treatment in the town of Cunqueiros, located in the municipality of Proença-a-Nova. The intervention focused on creating a modern and efficient infrastructure for effluent management, ensuring compliance with health and environmental protection regulations.



Context and Need

The project’s necessity stemmed from providing Cunqueiros with a completely new drainage system capable of serving a population distributed across 269 housing units. Through topographic surveys and field analyses, physical and geological constraints were identified that demanded a rigorous technical solution. The central objective was to guarantee gravitational flow and self-cleaning of the collectors, preventing the sedimentation of solids and ensuring the durability of the pipes through strict criteria of velocity and inclination.

Summary of the Project Completed

The implemented sanitation system comprises a collection network in PVC-SN8, FFD, and HDPE, installed in existing streets with varying laying depths to ensure hydraulic functionality. The project was structured around three main axes:

The infrastructure is complemented by a support building for electromechanical equipment and electrical panels, ensuring the automatic and safe operation of the entire system.


Would you like to learn more about hydraulic infrastructure solutions or discuss a specific project for your municipality? Contact us.

Discover how we can make your project a reality.

Get in touch with us and let’s create something extraordinary together.

cta_promo_1